Två biogasbussar står vid snabbtankningen i Fredriksdals bussdepå för att tanka biogas.

Tillbaka

Completed 5-year warranty inspection at Fredriksdal bus depot

One of our largest projects ever is the biogas bus depot Fredriksdal in Hammarby Sjöstad, which was inaugurated in 2017. Although we have built larger refueling stations for eco-friendly biomethane buses over the years, this station is unique because 120 buses are quickly refueled with renewable CNG in the evening.

This places particularly high demands on compressor capacity, gas storage, and built-in redundancy to ensure availability and maintain minimal refueling times. We are incredibly proud that we completed the project in the fall with a 5-year warranty inspection and that not a single bus trip has been disrupted due to a biogas bus being unable to refuel at the station.

Read more about the project at Commissioning of the new Fredriksdal bus depot in Hammarby Sjöstad – Process Control GT.

Latest news

Fler nyheter

New CBG Filling Station Delivered to Lyse, Norway

March 2023
At Processkontroll Green Technology, we are proud to have delivered a new CBG filling station to the Norwegian company Lyse in the Stavanger region.

Gasum refueling station for liquid and compressed biomethane in Luleå

March 2023
Yesterday, Gasum’s new refueling station for liquefied and compressed biogas was inaugurated in Luleå municipality. We are grateful for the continued trust in allowing us to deliver this LCBG station to Gasum, following the sibling station in Ålesund earlier this winter.

Completed 5-year warranty inspection at Fredriksdal bus depot

January 2023
We continually conclude projects with approved warranty inspections, but we wanted to highlight this one in particular: the Fredriksdal bus depot in Hammarby Sjöstad turned out to be an exceptionally fantastic project with extreme demands for rapid refueling of biogas buses.

Biogas decompression unit reduces the pressure to fry meatballs fossil-free

March 2023
Our mobile gas storages are filled with biomethane, and the biogas decompression unit reduces the pressure for use in various applications. We have recently commissioned a smaller decompression unit that will be used to fry meatballs with fossil-free biogas!

New LCBG station in Ålesund, Norway

January 2023
We are proud to have delivered another refueling station for liquefied and compressed biogas to Gasum in Ålesund, Norway. This station will contribute to fossil-free transportation with biomethane that can be refueled both as liquefied BioLNG and as compressed CBG.

New Bio-LNG refueling station in Norrköping with a climate-smart solution for the boil-off

October 2022
We have built a new pressure regulation facility for Örebro municipality where liquid biogas can be vaporized as back-up and distributed via the local gas network.