Design & Construktion

Turnkey or basic delivery
– you choose, we build

Application

We deliver security and quality

In our modern production facilities in Stora Höga, we design, construct, program and produce all our gas filling stations and mobile gas storages. The fact that we build indoors and independently choose components from leading suppliers guarantees the highest quality. It also means that function tests and checks of an accredited body can be done before delivery, which means that the time for on-site assembly and commissioning is minimized.

One of our specialties is to build filling stations that relate to the environment in which they are to be placed and the design can be done exactly as the customer wishes. The CBG filling station in Kallebäck outside Gothenburg has a surface with a wooden structured panel and a gable roof with a brick structure, the station in Hammarby Sjöstad has an asymmetrical shape, like a piece of cheese, and a sloping roof covered with sedum plants. At the petrol station in Åhaga in Borås, a brick facade was built to match the protected environment in the Åhaga area.
All this at costs that are only about 3% higher than a standard station.

We also build gas filling stations as a turnkey contract and then handle all permit management and all necessary ground work – if desired.
We deliver security and quality.

Latest news

Fler nyheter

An Eventful 2023

December 2023
Processkontroll Green Technology concludes a successful year marked by development and innovation. Despite challenges like the elimination of tax exemption for biomethane, we have delivered many fueling stations and launched a new compressor, achieved milestones with mobile gas storages, and supported the industry in transitioning to fossil-free alternatives.

Bo Axelsson New CEO

January 2024
We are delighted to welcome Bo Axelsson as our new CEO starting January 1st. Bo brings extensive experience in leading organizations, most recently as CEO of Swede Ship.

New Decompression Module for Biokraft Södertörn

November 2023
Processkontroll Green Technology has recently completed the installation and commissioning of a decompression unit for Biokraft, located in Södertörn.

New CBG Filling Station Delivered to Lyse, Norway

March 2023
At Processkontroll Green Technology, we are proud to have delivered a new CBG filling station to the Norwegian company Lyse in the Stavanger region.

Gasum refueling station for liquid and compressed biomethane in Luleå

March 2023
Yesterday, Gasum’s new refueling station for liquefied and compressed biogas was inaugurated in Luleå municipality. We are grateful for the continued trust in allowing us to deliver this LCBG station to Gasum, following the sibling station in Ålesund earlier this winter.

Completed 5-year warranty inspection at Fredriksdal bus depot

January 2023
We continually conclude projects with approved warranty inspections, but we wanted to highlight this one in particular: the Fredriksdal bus depot in Hammarby Sjöstad turned out to be an exceptionally fantastic project with extreme demands for rapid refueling of biogas buses.