Bus depot

Fill one or hundreds at the same time

A biogas filling station that is specially built for bus traffic and there are two different variants of CBG filling station for buses; fast filling and slow filling.

Application

CBG filling system for all needs in large and small bus depots

Theese filling stations are specially designed for bus depots and there are two different variants of bus stations for buses; fast filling and slow filling.
Via bus ramps, up to several hundred buses can be connected at the same time, to be slowly refueled during the night and ready for operation the next morning. The fast-filling dispensers fill a bus tank with biogas within a few minutes, in a similar way to passenger car filling stations.

The slow-filling bus ramps have the advantage that they do not have to be monitored when refueling, since the process is handled automatically during the night. The driver does not have to wait for the bus to be filled and many buses can be refueled at the same time, when they are parked anyway.
Sometimes the need arises to fill a gas tank immediately and then a fast filling station is needed as a complement.
The most efficient bus depot uses both types of tank systems, which means that you are equipped for all situations and needs that arise.

Latest news

Fler nyheter

An Eventful 2023

December 2023
Processkontroll Green Technology concludes a successful year marked by development and innovation. Despite challenges like the elimination of tax exemption for biomethane, we have delivered many fueling stations and launched a new compressor, achieved milestones with mobile gas storages, and supported the industry in transitioning to fossil-free alternatives.

Bo Axelsson New CEO

January 2024
We are delighted to welcome Bo Axelsson as our new CEO starting January 1st. Bo brings extensive experience in leading organizations, most recently as CEO of Swede Ship.

New Decompression Module for Biokraft Södertörn

November 2023
Processkontroll Green Technology has recently completed the installation and commissioning of a decompression unit for Biokraft, located in Södertörn.

New CBG Filling Station Delivered to Lyse, Norway

March 2023
At Processkontroll Green Technology, we are proud to have delivered a new CBG filling station to the Norwegian company Lyse in the Stavanger region.

Gasum refueling station for liquid and compressed biomethane in Luleå

March 2023
Yesterday, Gasum’s new refueling station for liquefied and compressed biogas was inaugurated in Luleå municipality. We are grateful for the continued trust in allowing us to deliver this LCBG station to Gasum, following the sibling station in Ålesund earlier this winter.

Completed 5-year warranty inspection at Fredriksdal bus depot

January 2023
We continually conclude projects with approved warranty inspections, but we wanted to highlight this one in particular: the Fredriksdal bus depot in Hammarby Sjöstad turned out to be an exceptionally fantastic project with extreme demands for rapid refueling of biogas buses.