CBG filling station vehicle gas biogas

Back to top

New CBG filling station for Svensk Biogas in Norrköping Händelö

We are proud to have delivered a new CBG filling station to Svensk Biogas in the industrial area Händelö, Norrköping. The station, which replaces an older facility, is equipped with our proprietary compressors and is powered by fossil-free biogas from Svensk Biogas's own production. The biogas is transported with our agile, mobile gas tankers.

The new filling station contributes to a greener future by providing both heavy trucks and cars in the area with fossil-free fuel.

Patrik Carlen, our project manager, comments:
"It is always rewarding to deliver projects that run so smoothly. Thanks to the fact that the station was prefabricated in our facilities, the installation could be carried out quickly and efficiently, in close cooperation with the competent team at Svensk Biogas."

With this delivery, we are strengthening the biogas infrastructure in Norrköping and contributing to increased operational reliability and improved logistics.

Latest news

More news

New flatbed filling plant to Fredrikstad, Norway

December 2024
Just before Christmas, we had the pleasure of installing and commissioning a new gas flare filling plant in Fredrikstad, Norway. Using a high-performance Pignone compressor, the plant can fill up to 6 mobile gas cylinders with biogas simultaneously.

The past year - Merry Christmas & Happy New Year!

December 2024
A record year for Processkontroll Green Technology with more projects than ever in biogas and hydrogen, paving the way for a greener future in both mobility and industry.

Reintroduced tax exemption on biogas - a long-awaited opportunity for green transition

December 2024
It's been a long wait, but finally - just in time for us to sit in front of the TV and cheer the exploits of Donald Duck and Robin Hood - the tax exemption for hashtag#biogas has been reintroduced! This will make it much easier for hauliers to switch to climate-friendly biogas.

New CBG filling station for Svensk Biogas in Norrköping Händelö

November 2024
New CBG filling station in Norrköping delivered to Svensk Biogas - a fossil-free and efficient solution that strengthens the infrastructure for both heavy vehicles and passenger cars in the area.

New LCBG filling station for liquid and compressed biogas in Kristinehamn

November 2024
Our latest LCBG station for liquid and compressed biogas is now operational in Kristinehamn. The station was prefabricated in our Stora Höga facility and assembled on site in Kristinehamn, where it now contributes to a stronger infrastructure for sustainable energy gases.

FAT approved for our second hydrogen compressor station

October 2024
Last week we completed another successful FAT (Factory Acceptance Test) for our second hydrogen compressor station. This project is particularly exciting as, for the first time, we will be site-building the plant directly at the customer's premises, providing a flexible and customized solution.

Welcome to Processkontroll GT

0303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA