Design & construction

Turnkey or basic delivery - you choose, we build

Area of use

We deliver safety and quality

In our modern production facilities in Stora Höga, we design, construct, program and produce all our substations and gas transportation units. Building indoors and independently selecting components from leading suppliers ensures the highest quality. It also means that functional tests and checks by an accredited body can be carried out before delivery, which means that the time for site assembly and commissioning is minimized.

One of our specialties is to build filling stations that match the environment where they are to be placed and the design can be made exactly as the client wishes. The filling station in Kallebäck, outside Gothenburg, has a wooden panel surface with a wooden structure and a pitched roof with a brick structure; the station in Hammarby Sjöstad has an asymmetrical shape, like a piece of cheese, and a sloping roof covered with sedum plants. At the Åhaga filling station in Borås, a brick facade was built to blend in with the protected environment of the Åhaga area.
All this at a cost only about 3% higher than a standard station.

We also construct gas filling stations as a turnkey contract and then handle all permit management and all the necessary groundwork - if desired.
We deliver safety and quality.

Latest news

More news

New flatbed filling plant to Fredrikstad, Norway

December 2024
Just before Christmas, we had the pleasure of installing and commissioning a new gas flare filling plant in Fredrikstad, Norway. Using a high-performance Pignone compressor, the plant can fill up to 6 mobile gas cylinders with biogas simultaneously.

The past year - Merry Christmas & Happy New Year!

December 2024
A record year for Processkontroll Green Technology with more projects than ever in biogas and hydrogen, paving the way for a greener future in both mobility and industry.

Reintroduced tax exemption on biogas - a long-awaited opportunity for green transition

December 2024
It's been a long wait, but finally - just in time for us to sit in front of the TV and cheer the exploits of Donald Duck and Robin Hood - the tax exemption for hashtag#biogas has been reintroduced! This will make it much easier for hauliers to switch to climate-friendly biogas.

New CBG filling station for Svensk Biogas in Norrköping Händelö

November 2024
New CBG filling station in Norrköping delivered to Svensk Biogas - a fossil-free and efficient solution that strengthens the infrastructure for both heavy vehicles and passenger cars in the area.

New LCBG filling station for liquid and compressed biogas in Kristinehamn

November 2024
Our latest LCBG station for liquid and compressed biogas is now operational in Kristinehamn. The station was prefabricated in our Stora Höga facility and assembled on site in Kristinehamn, where it now contributes to a stronger infrastructure for sustainable energy gases.

FAT approved for our second hydrogen compressor station

October 2024
Last week we completed another successful FAT (Factory Acceptance Test) for our second hydrogen compressor station. This project is particularly exciting as, for the first time, we will be site-building the plant directly at the customer's premises, providing a flexible and customized solution.

Welcome to Processkontroll GT

0303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA