Back to top

New CBG filling station in Orkanger

This week we are proud to announce that we have commissioned another CBG filling station in Norway, this time in Orkanger, near Trondheim in Trøndelag. This is the second station we are delivering to Gasnor this year, following the successful commissioning of the station in Verdal earlier this year. Both of these stations are important steps in the expansion of the fossil-free compressed biogas infrastructure in the region, and we look forward to continuing to support Gasnor in their efforts to offer sustainable and climate-friendly fuels.
Both stations are supplied with biogas via our mobile gas tankers, providing a flexible and efficient solution to meet the needs on site. We look forward to continuing to develop more stations together and strengthening the infrastructure for biogas-powered transportation in Norway.

Latest news

More news

6,000 composite cylinders – a milestone that enables the Nordic biogas model

February 2026
Together with Hexagon Agility, Processkontroll Green Technology hasGreen Technology an important milestone: 6,000 composite cylinders delivered for our mobile gas tank solutions for biomethane distribution.

Flat filling of compressed biogas at the Gammalstorp farm facility

January 2026
This week, we commissioned our new flatbed filling station at the Gammalstorp farm biogas plant outside Linköping in collaboration with IGF.

New filling station for liquid and compressed biogas for OG Clean Fuels in Grums

January 2026
During the winter, we built a new LCBG filling station for liquid biogas (LBG) and compressed biogas (CBG). This station also has a boil-off compressor for efficient use of the boil-off gas.

Green transport of mobile biogas tanks

January 2026
Today, our customer Småländska Bränslen picked up the first two of a total of six new mobile biogas tanks that we built for Slättäng Biogas – a new farm facility outside Ystad.

Two new CBG stations in operation for Molgas Energy Group in Trøndelag

November 2025
In late autumn, we at Processkontroll Green Technology two new CBG stations – compressed biomethane, also known as vehicle gas – for Molgas Energy Group in Stjørdal and Namsos in Trøndelag, Norway.

Europe's largest filling station for liquid and compressed biogas delivered to Gasum

May 2025
Europe's largest filling station for liquid (LBG) and compressed (CBG) biogas has now been inaugurated in Kallhäll, Järfälla municipality. Processkontroll GT AB has built this modern station, which is an important step in Sweden's work with sustainable transport.

Welcome to Processkontroll GT

+46 (0)303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA