Back to top

New LCBG filling station for liquid and compressed biogas in Kristinehamn

We are pleased to announce that our latest LCBG station for liquid and compressed biogas is now operational in Kristinehamn. The station was prefabricated in our Stora Höga facility and assembled on site in Kristinehamn, where it now contributes to a stronger infrastructure for sustainable energy gases.

One of the most fascinating parts of the work was the cooling of the cryogenic tank. Using liquid nitrogen at -190 degrees, the tank is gradually cooled down, creating an impressive and powerful cloud - a visual spectacle that is completely harmless.

This is Gasum's 26th liquid biogas filling station, and we are proud to contribute to their efforts to develop a sustainable energy infrastructure. Biogas is an optimal solution for fossil-free transportation with heavy trucks and plays a key role in the transition towards greener transport.

We would like to thank Gasum for their trust and our employees for making this delivery possible!

Latest news

More news

6,000 composite cylinders – a milestone that enables the Nordic biogas model

February 2026
Together with Hexagon Agility, Processkontroll Green Technology hasGreen Technology an important milestone: 6,000 composite cylinders delivered for our mobile gas tank solutions for biomethane distribution.

Flat filling of compressed biogas at the Gammalstorp farm facility

January 2026
This week, we commissioned our new flatbed filling station at the Gammalstorp farm biogas plant outside Linköping in collaboration with IGF.

New filling station for liquid and compressed biogas for OG Clean Fuels in Grums

January 2026
During the winter, we built a new LCBG filling station for liquid biogas (LBG) and compressed biogas (CBG). This station also has a boil-off compressor for efficient use of the boil-off gas.

Green transport of mobile biogas tanks

January 2026
Today, our customer Småländska Bränslen picked up the first two of a total of six new mobile biogas tanks that we built for Slättäng Biogas – a new farm facility outside Ystad.

Two new CBG stations in operation for Molgas Energy Group in Trøndelag

November 2025
In late autumn, we at Processkontroll Green Technology two new CBG stations – compressed biomethane, also known as vehicle gas – for Molgas Energy Group in Stjørdal and Namsos in Trøndelag, Norway.

Europe's largest filling station for liquid and compressed biogas delivered to Gasum

May 2025
Europe's largest filling station for liquid (LBG) and compressed (CBG) biogas has now been inaugurated in Kallhäll, Järfälla municipality. Processkontroll GT AB has built this modern station, which is an important step in Sweden's work with sustainable transport.

Welcome to Processkontroll GT

+46 (0)303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA