Latest news

Fler nyheter

Gasum refueling station for liquid and compressed biomethane in Luleå

March 2023
Yesterday, Gasum’s new refueling station for liquefied and compressed biogas was inaugurated in Luleå municipality. We are grateful for the continued trust in allowing us to deliver this LCBG station to Gasum, following the sibling station in Ålesund earlier this winter.

Completed 5-year warranty inspection at Fredriksdal bus depot

January 2023
We continually conclude projects with approved warranty inspections, but we wanted to highlight this one in particular: the Fredriksdal bus depot in Hammarby Sjöstad turned out to be an exceptionally fantastic project with extreme demands for rapid refueling of biogas buses.

New LCBG station in Ålesund, Norway

January 2023
We are proud to have delivered another refueling station for liquefied and compressed biogas to Gasum in Ålesund, Norway. This station will contribute to fossil-free transportation with biomethane that can be refueled both as liquefied BioLNG and as compressed CBG.

New Bio-LNG refueling station in Norrköping with a climate-smart solution for the boil-off

October 2022
We have built a new pressure regulation facility for Örebro municipality where liquid biogas can be vaporized as back-up and distributed via the local gas network.

LBG evaporation as pressure regulation in Örebro’s gas network

October 2022
We have built a new pressure regulation facility for Örebro municipality where liquid biogas can be vaporized as back-up and distributed via the local gas network.

A “Usain Bolt decompression facility” that stands in the starting block all year round

June 2022
Before the summer, we commissioned a new decompression plant for Gasum in Nynäshamn as a back-up solution that can start at a second’s notice with a flow of 4000 kg/h.