CBG filling station biogas vehicle gas Smålandsstenar

Back to top

Three new biogas filling stations in Småland

We are proud to present our latest projects in collaboration with Småländska Bränslen. Through the establishment of three new CBG stations for compressed biomethane, we further facilitate fossil-free transport in Småland.

Biogas trucks in Smålandstenar: Our new biogas filling station in Smålandstenar enables Västbo Transport to switch to completely fossil-free transport with biogas, which strengthens the region's capacity for environmentally friendly transport solutions.

Progress in Växjö: In Växjö, we have established a new vehicle gas station that is also adapted for fast refueling of buses. This station contributes to efficient and sustainable public transport with biogas buses.

Upgrade in Jönköping: In Jönköping, we have helped Småländska Bränslen to upgrade one of our older stations, which opens up for further biogas refueling opportunities.

Samverkan för Hållbarhet: "We firmly believe in biogas as an important building block for fossil-free heavy transportation. With 16 CBG stations already in operation (see biogasbilen.se) and more on the way, our collaboration with Patrik and his project team at Processkontroll Green Technology is a cornerstone to reach our goals. In addition, their service team is always quick to solve any problems," says Peter Bäckström at Småländska Bränslen.

Latest news

More news

New flatbed filling plant to Fredrikstad, Norway

December 2024
Just before Christmas, we had the pleasure of installing and commissioning a new gas flare filling plant in Fredrikstad, Norway. Using a high-performance Pignone compressor, the plant can fill up to 6 mobile gas cylinders with biogas simultaneously.

The past year - Merry Christmas & Happy New Year!

December 2024
A record year for Processkontroll Green Technology with more projects than ever in biogas and hydrogen, paving the way for a greener future in both mobility and industry.

Reintroduced tax exemption on biogas - a long-awaited opportunity for green transition

December 2024
It's been a long wait, but finally - just in time for us to sit in front of the TV and cheer the exploits of Donald Duck and Robin Hood - the tax exemption for hashtag#biogas has been reintroduced! This will make it much easier for hauliers to switch to climate-friendly biogas.

New CBG filling station for Svensk Biogas in Norrköping Händelö

November 2024
New CBG filling station in Norrköping delivered to Svensk Biogas - a fossil-free and efficient solution that strengthens the infrastructure for both heavy vehicles and passenger cars in the area.

New LCBG filling station for liquid and compressed biogas in Kristinehamn

November 2024
Our latest LCBG station for liquid and compressed biogas is now operational in Kristinehamn. The station was prefabricated in our Stora Höga facility and assembled on site in Kristinehamn, where it now contributes to a stronger infrastructure for sustainable energy gases.

FAT approved for our second hydrogen compressor station

October 2024
Last week we completed another successful FAT (Factory Acceptance Test) for our second hydrogen compressor station. This project is particularly exciting as, for the first time, we will be site-building the plant directly at the customer's premises, providing a flexible and customized solution.

Welcome to Processkontroll GT

0303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA