The week before midsummer, we commissioned the bus filling station in Växjö, which supplies 50 buses with locally produced biogas. The facility has 48 slow-fill stations and two fast-fill stations. It is also equipped with space for five mobile gas storage facilities that will serve as backup in the event that biogas production is disrupted.
The installation went smoothly and according to schedule, and after just two weeks we were able to put the system into operation. We can now congratulate Växjö on an efficient and safe supply of gas-powered buses.