Back to top

Efficient and fossil-free de-icing of trains: Innovative project with Flogas and Train Alliance

As large parts of Sweden were unexpectedly swept into the grip of winter just after Easter, it was particularly pleasing to see one of our latest projects well underway. Through a partnership with Flogas Sverige AB, we have successfully delivered a decompression plant and a mobile biogas truck to Train Alliance in Hallsberg.

This initiative facilitates efficient and completely fossil-free de-icing of trains within their facilities, which is a clear sign of our joint commitment to integrating sustainable energy solutions across the mobility sector. The project thus contributes to improved environmental and operational efficiency.

Flogas provides the necessary fossil-free biogas, which is delivered in our mobile gas tank equipped with composite cylinders. Our mobile gas cylinders are specially designed to handle up to 4.5 tons of biogas at a pressure of 250 bar. This capacity plays a crucial role in supplying the de-icing process with the energy needed. The high pressure from the cylinders is reduced in a controlled manner in our decompression container to exactly match the needs of the burners, ensuring both an efficient and safe de-icing process.

gg
IMG_7597_2

Latest news

More news

Two new CBG stations in operation for Molgas Energy Group in Trøndelag

November 2025
In late autumn, we at Processkontroll Green Technology two new CBG stations – compressed biomethane, also known as vehicle gas – for Molgas Energy Group in Stjørdal and Namsos in Trøndelag, Norway.

Europe's largest filling station for liquid and compressed biogas delivered to Gasum

May 2025
Europe's largest filling station for liquid (LBG) and compressed (CBG) biogas has now been inaugurated in Kallhäll, Järfälla municipality. Processkontroll GT AB has built this modern station, which is an important step in Sweden's work with sustainable transport.

New flatbed filling plant to Fredrikstad, Norway

January 2025
Just before Christmas, we had the pleasure of installing and commissioning a new gas flare filling plant in Fredrikstad, Norway. Using a high-performance Pignone compressor, the plant can fill up to 6 mobile gas cylinders with biogas simultaneously.

The past year - Merry Christmas & Happy New Year!

December 2024
A record year for Processkontroll Green Technology with more projects than ever in biogas and hydrogen, paving the way for a greener future in both mobility and industry.

Reintroduced tax exemption on biogas - a long-awaited opportunity for green transition

December 2024
It's been a long wait, but finally - just in time for us to sit in front of the TV and cheer the exploits of Donald Duck and Robin Hood - the tax exemption for hashtag#biogas has been reintroduced! This will make it much easier for hauliers to switch to climate-friendly biogas.

New CBG filling station for Svensk Biogas in Norrköping Händelö

November 2024
New CBG filling station in Norrköping delivered to Svensk Biogas - a fossil-free and efficient solution that strengthens the infrastructure for both heavy vehicles and passenger cars in the area.

Welcome to Processkontroll GT

+46 (0)303-72 61 00
Address
Vallenvägen 5
444 60 STORA HÖGA