Upgrade of the PLC control in the Bus Depot

In 2010, we had the honor of building one of the Nordic region's largest biogas bus depots in Frihamnen, Stockholm for SL. With four compressors, the entire large biogas bus fleet was refueled with both slow refueling via ramp and fast refueling dispensers.

Time passes, technology evolves. Just as we don't expect anyone to work on a PC from 2010, we realized that the control system from the same year was outdated. The limitations of remote monitoring via SCADA server and alarm management were clear.

The solution: Upgrade from the old Siemens Classic PLC to the modern S7-1500 system. Together with Siemens Unified HMI, it now offers an intuitive operating environment for the operators.

The challenge: How to manage an upgrade with minimal disruption? Thanks to careful planning, we were able to shut down on Monday morning and have the depot operational again already on Wednesday. In the meantime, the buses refueled at other depots such as Mårtensdal, Charlottendal or Gubbängen, which we also had the pleasure of building.

We replaced 5 PLC systems, control cabinets, with associated HMI. The software has also been upgraded to PKGT's state-of-the-art standard, which not only meets, but exceeds, all the requirements set in the project.

Proud to lead the way in modern technology and ensure our transportation solutions are as efficient and reliable as possible!

Latest news

More news

6,000 composite cylinders – a milestone that enables the Nordic biogas model

February 2026
Together with Hexagon Agility, Processkontroll Green Technology hasGreen Technology an important milestone: 6,000 composite cylinders delivered for our mobile gas tank solutions for biomethane distribution.

Flat filling of compressed biogas at the Gammalstorp farm facility

January 2026
This week, we commissioned our new flatbed filling station at the Gammalstorp farm biogas plant outside Linköping in collaboration with IGF.

New filling station for liquid and compressed biogas for OG Clean Fuels in Grums

January 2026
During the winter, we built a new LCBG filling station for liquid biogas (LBG) and compressed biogas (CBG). This station also has a boil-off compressor for efficient use of the boil-off gas.

Green transport of mobile biogas tanks

January 2026
Today, our customer Småländska Bränslen picked up the first two of a total of six new mobile biogas tanks that we built for Slättäng Biogas – a new farm facility outside Ystad.

Two new CBG stations in operation for Molgas Energy Group in Trøndelag

November 2025
In late autumn, we at Processkontroll Green Technology two new CBG stations – compressed biomethane, also known as vehicle gas – for Molgas Energy Group in Stjørdal and Namsos in Trøndelag, Norway.

Europe's largest filling station for liquid and compressed biogas delivered to Gasum

May 2025
Europe's largest filling station for liquid (LBG) and compressed (CBG) biogas has now been inaugurated in Kallhäll, Järfälla municipality. Processkontroll GT AB has built this modern station, which is an important step in Sweden's work with sustainable transport.

Welcome to Processkontroll GT